Call : 08061034506
We are remarkable entity, engaged in manufacturing and supplying GRP Swimming Pool. It is made from quality fiberglass raw material with ample wooden support. This pool has a smooth and good finish. It takes only 2-4 days for pool installation. Also, GRP Swimming Pool is designed for the easy drainage of water, soap and shampoo.
Other details:
Application | Swimming Pool |
Material | GRP |
Condition | New |
Color | Available in different colour |
Size | Customized,As per order |
S.V.COMPOSITES AND ENGINEERING PRIVATE LIMITED
All Rights Reserved.(Terms of Use) Developed and Managed by Infocom Network Private Limited. |